The Cammeray project was a demolition, site clearance and rock excavation. The project started with a concrete 4 car garage demolition. The job had to be stripped of all vegetation and large trees prior to the commencement of the rock excavation. The project involved a 1500 cubic metre rock excavation. Rock vibration monitors were placed on the adjacent boundary to ensure the heritage listed house foundations were undisturbed, as per the development application conditions.
This job was undertaken through a combination of Rock Sawing and Rock Hammering on our 8 Tonne Takeuchi Machine, in combination with a smaller Takeuchi machine.
Location: Cammeray, Sydney
Machinary Used:
Takeuchi 8 Tonne Machine
Takeuchi 4.5 Tonne Machine
Client: Gemba Constructions
Challenges: The adjacent property was a heritage listed property, therefore to ensure the foundations were not disturbed there were vibration monitors placed on the foudations to ensure vibration levels were within the limits as per the development application conditions.
Description:
Do you need a reliable difficult access and rock excavation contractor for your next project? Maybe you have questions or concerns about what we can do. At Rick Davis Contracting we go the extra mile for all our clients are here to help. Contact our staff today by giving us a call or filling out our online form.